ISO 9001:2015 MSME REGISTERED
Projects

Selected projects.

A working list of recent automation engagements. Filter by industry or cluster to find work closest to your plant. Each project is a real installation — we’ll fill in photos and full case studies as clients approve.

Industry
Cluster
VFD retrofit on cane preparation
Sugar Drives & Power

VFD retrofit on cane preparation

2024 Uttar Pradesh
↓ 14% energy on cane carrier drives
↓ 38% unscheduled stoppages during season
Payback achieved within 9 months
Centrifugal PLC migration
Sugar Control & Automation

Centrifugal PLC migration

2023 Maharashtra
Mid-season swap-out completed in 36 hours
Zero crystal loss through the cutover
New system live for full balance of season
Season-long stoppage IoT dashboard
Sugar Instrumentation & IoT

Season-long stoppage IoT dashboard

2024 Uttar Pradesh
WhatsApp alerts within 60 seconds of any stoppage
Season-end stoppage report auto-generated
Zero manual data entry by shift operators
Fermentation & distillation SCADA
Distillery Control & Automation

Fermentation & distillation SCADA

2024 Maharashtra
Batch traceability records online from Day 1
SCADA commissioned within 24-hour downtime window
Excise-audit-ready electronic batch logs
CPCB online effluent monitoring
Distillery Instrumentation & IoT

CPCB online effluent monitoring

2023 Uttar Pradesh
Live telemetry to state pollution control board
Zero NOC notices since go-live
Calibration records auto-archived monthly
VFD & APFC upgrade — distillery
Distillery Drives & Power

VFD & APFC upgrade — distillery

2024 Karnataka
↓ 11% energy across ETP and process pumps
Power factor corrected to 0.98 from 0.74
MD demand charges reduced every billing cycle
BOP instrumentation upgrade
Power Instrumentation & IoT

BOP instrumentation upgrade

2023 Gujarat
Real-time auxiliary visibility for operators
↓ 22% unplanned trips in 12 months post-commissioning
Remote monitoring dashboard live for plant manager
ID/FD fan VFD retrofit — 15MW co-gen
Power Drives & Power

ID/FD fan VFD retrofit — 15MW co-gen

2024 Maharashtra
↓ 18% auxiliary power consumption on fans
7-month simple payback on investment
Fan speed modulation reduces boiler pressure swings
BOP SCADA integration with turbine DCS
Power Control & Automation

BOP SCADA integration with turbine DCS

2024 Tamil Nadu
Single operator console for turbine + BOP
↓ Alarm floods by 60% via unified alarm management
Audit-ready shift reports auto-generated every cycle
Recipe management & CIP automation
Food Control & Automation

Recipe management & CIP automation

2024 Punjab
FSSAI-grade electronic batch records from Day 1
↓ 25% average changeover time across 6 SKUs
CIP completion verified electronically — no manual sign-off
STP & ETP SCADA aggregation
Water Control & Automation

STP & ETP SCADA aggregation

2023 Haryana
5 distributed skids visible on one operator screen
Dosing pump run-hours tracked per week automatically
CPCB compliance reports without manual data entry
Batch reactor SIS upgrade
Chemical Control & Automation

Batch reactor SIS upgrade

2024 Gujarat
SIL-2 interlocks with proof-test records online
Zero spurious trips in 18 months post-commissioning
SIS documentation accepted at PESO audit without query
Ready to engage

Tell us about your plant.

Send us a brief, or call us directly. We'll respond within one working day.

Site Survey